Enter your passcode. Inspection records stay on this device.
{{ bioName }}, or use the passcode below
Passcode not recognised.
Oceania Horizon Pty Ltd
First-party inspection by your own people, carrying your own outcome. Recorded on the device, reported the same day.
No inspections saved yet.
Effective 1 May 2026. Machinery physical inspections are carried out at anchorage only, or up to 30 days prior to arrival at the load or discharge port. The Port Hedland Vessel Vetting Form remains a Pilbara Ports controlled document completed by the vessel; this inspection does not replace it.
One or more trigger makes a machinery physical inspection mandatory. The Harbour Master may also direct an inspection under Trigger E.
Where a trigger applies, the scope below is mandatory.
What to look for when something goes beyond the standard. Use each framework's own language in the "Where this inspection exceeds standard practice" note, it reads as evidence, not a compliment.
Dry Bulk Centre of Excellence's Dry Bulk Management Standard. Rates management practice across four pillars, each on a four level maturity scale.
Ready to adapt: Planned maintenance close out is fully evidenced with photographs and dated records without prompting, consistent with DryBMS Excellence level maturity for the Plant pillar.
RightShip's Inspection Ship Questionnaire, used for bulk carriers and general cargo and container ships. No numbered maturity scale, every item sorts into one of three tiers instead.
Ready to adapt: Mooring line management goes beyond the statutory and recommended requirements and meets the RISQ desirable-item benchmark for best practice documentation.
OCIMF's Ship Inspection Report Programme, second generation. Built for tankers, but the language transfers well, it is the clearest of the three about what exceeding expectations means.
Ready to adapt: The bosun's handling of the mooring operation exceeded normal expectations under pressure, consistent with a positive SIRE 2.0 human factors observation.
Shoot as you walk. Captures taken in the same area within three minutes group as one issue, so five shots of one defect stay together and you pick the clearest afterwards. Dictate the note with the microphone on your keyboard.
One or more yes makes the machinery physical inspection mandatory.
A repeat finding is evidence the corrective action did not hold. It is read as a system issue, not a defect, and it carries weight in both the report and any vetting review.
Scored against the four DryBMS pillars so the operator reads the result in a framework they already use. A suggested level is offered from what was found; override it where your judgement differs.
A.1206(34) turns on effectiveness, not on whether a procedure exists. Operational control is a check on the effectiveness of communication, interaction and familiarity of the crew, and clear grounds arise where the system is found not to be effectively implemented.
Areas marked not inspected are left out of the report entirely, so the document only shows what was actually examined. The report opens in Word for editing before it goes out. Photographs are resized as the report is built so the finished document stays under the 10 MB most mail servers accept. Building it needs no signal, the share sheet offers Mail, Signal, AirDrop and Files, and if you are offline it saves to the device for sending later.